Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Rear extension Building Regulations

Building Regulations for rear extensions

Every rear extension needs Building Regulations approval, even when planning permission is not needed. The approval covers the foundations, structure, drainage, fire safety, ventilation, insulation and glazing, and ends with a completion certificate you keep with the deeds.

Building control inspector with a clipboard checking new blockwork walls of a rear extension under construction

What does Building Regulations approval involve?

Every rear extension in England needs Building Regulations approval, whether or not planning is needed. You can use the council's building control service or a registered building control approver, by full plans (checked before work, usually within five weeks) or a building notice, and you get a completion certificate at the end.

What has to be shown on the drawings?

Foundation depth and width, the floor, wall and roof build-ups with insulation, the steel beam and its bearings, drainage runs and any build-over, fire separation near boundaries, escape routes, ventilation for the new room and the old room behind it, and the glazing specification. The structural engineer's calculations go with them.

New fabric must meet Approved Document L (2021 edition incorporating 2023 amendments): walls 0.18, roof 0.15 and floor 0.18 W/m²K, windows 1.4 W/m²K or Band B. Under the simple route, new windows, doors and rooflights should not exceed 25% of the extension floor area plus any openings removed; more glass is possible with a whole-house calculation.

What does it cost?

Construction drawings and structural calculations typically cost £2,500–£5,500 including VAT for a single-storey extension and £4,000 to £7,000 for two storeys. Building control fees are usually £650 to £1,300 for a single-storey extension and are paid to the council or the approver.

What is included?

  • Construction drawings
  • Structural engineer's calculations
  • Energy and glazing checks
  • Drainage and build-over checks
  • Building control application
  • Site inspections coordinated
  • Completion certificate
  • Electrical and gas certificates handed over

FAQ

Rear extension Building Regulations questions

Full plans or building notice?

Full plans for most extensions: the design is checked before work starts. A building notice suits only simple jobs.

Who inspects the work?

The council's building control team or a registered building control approver (in Scotland, the council's building standards team).

What is a completion certificate?

The document confirming the work meets the regulations. Keep it; buyers' solicitors ask for it.

Do I need regs if I don't need planning?

Yes.

What stages are inspected?

Typically foundations, damp proofing, drainage, steelwork, insulation and completion.

Can you take over an existing approval?

Yes, if the drawings and approval are transferable to us.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price