Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Isle of Wight

Building Regulations for rear extensions in the Isle of Wight

Construction drawings, structural calculations and building control through to the completion certificate. Across the Isle of Wight we handle the whole rear extension: survey, drawings, the planning route, building control and the build. Towns we cover here include Newport, Ryde and Cowes.

Building control inspector with a clipboard checking new blockwork walls of a rear extension under construction

Island and remote addresses in the Isle of Wight are by arrangement: we confirm whether we can take the job, and agree any travel costs, before the first visit.

Commuter semis and detached houses make up much of the Isle of Wight, and longer gardens make England's prior approval route for deeper rear extensions worth considering.

What does it cost in the Isle of Wight?

As a guide, £2,500–£5,500 including VAT. Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

What approvals does it need in the Isle of Wight?

Planning and Building Regulations are separate in England: even a permitted development extension is inspected for foundations, drainage, structure, insulation, fire safety and ventilation, through the council or a registered building control approver, ending with a completion certificate.

New fabric must meet Approved Document L (2021 edition incorporating 2023 amendments): walls 0.18, roof 0.15 and floor 0.18 W/m²K, windows 1.4 W/m²K or Band B. Under the simple route, new windows, doors and rooflights should not exceed 25% of the extension floor area plus any openings removed; more glass is possible with a whole-house calculation.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent.

Where in the Isle of Wight do we work?

FAQ

Questions people ask

Full plans or building notice?

Full plans for most extensions: the design is checked before work starts. A building notice suits only simple jobs.

Who inspects the work?

The council's building control team or a registered building control approver (in Scotland, the council's building standards team).

What is a completion certificate?

The document confirming the work meets the regulations. Keep it; buyers' solicitors ask for it.

Do you cover all of the Isle of Wight?

We cover 6 towns and districts in the Isle of Wight, including Newport, Ryde and Cowes. Remote and island addresses are by arrangement.

Who builds the extension?

Vetted building teams working under contract to us; your contract is with S&K Property Investments and Improvement Ltd.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or ask us about a site visit: visits here are by arrangement, and we confirm before booking.

CallGuide price