Hertfordshire
Building Regulations for rear extensions in Hertfordshire
Construction drawings, structural calculations and building control through to the completion certificate. Across Hertfordshire we handle the whole rear extension: survey, drawings, the planning route, building control and the build. Towns we cover here include Watford, Hemel Hempstead and Stevenage.

Hertfordshire mixes Victorian terraces with 1930s semis, so both side returns and full-width kitchen extensions suit houses here.
What does it cost in Hertfordshire?
As a guide, £2,500–£5,500 including VAT. Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.
What approvals does it need in Hertfordshire?
Every rear extension in England needs Building Regulations approval, whether or not planning is needed. You can use the council's building control service or a registered building control approver, by full plans (checked before work, usually within five weeks) or a building notice, and you get a completion certificate at the end.
New fabric must meet Approved Document L (2021 edition incorporating 2023 amendments): walls 0.18, roof 0.15 and floor 0.18 W/m²K, windows 1.4 W/m²K or Band B. Under the simple route, new windows, doors and rooflights should not exceed 25% of the extension floor area plus any openings removed; more glass is possible with a whole-house calculation.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent.
Where in Hertfordshire do we work?
- Watford
- Hemel Hempstead
- Stevenage
- St Albans
- Welwyn Garden City
- Cheshunt
- Hatfield
- Bishops Stortford
- Borehamwood
- Hitchin
- Hoddesdon
- Letchworth Garden City
- North Watford
- Harpenden
- Bushey
- Hertford
- Rickmansworth
- Potters Bar
- Berkhamsted
- Ware
- Enfield Lock
- Royston
- Croxley Green
- Broxbourne
- West Watford
- Batchworth
- Tring
- Chorleywood
- Codicote
- Baldock
- Abbots Langley
- Waltham Cross
FAQ
Questions people ask
Full plans or building notice?
Full plans for most extensions: the design is checked before work starts. A building notice suits only simple jobs.
Who inspects the work?
The council's building control team or a registered building control approver (in Scotland, the council's building standards team).
What is a completion certificate?
The document confirming the work meets the regulations. Keep it; buyers' solicitors ask for it.
Do you cover all of Hertfordshire?
We cover 32 towns and districts in Hertfordshire, including Watford, Hemel Hempstead and Stevenage.
Who builds the extension?
Vetted building teams working under contract to us; your contract is with S&K Property Investments and Improvement Ltd.