Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Lincolnshire

Building Regulations for rear extensions in Lincolnshire

Construction drawings, structural calculations and building control through to the completion certificate. Across Lincolnshire we handle the whole rear extension: survey, drawings, the planning route, building control and the build. Towns we cover here include Lincoln, Grimsby and Scunthorpe.

Building control inspector with a clipboard checking new blockwork walls of a rear extension under construction

Red-brick terraces and semis are typical of Lincolnshire. Coal-mining legacy areas in parts of the East Midlands can need a Coal Authority check before foundations are designed.

What does it cost in Lincolnshire?

As a guide, £2,500–£5,500 including VAT. Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

What approvals does it need in Lincolnshire?

Every rear extension in England needs Building Regulations approval, whether or not planning is needed. You can use the council's building control service or a registered building control approver, by full plans (checked before work, usually within five weeks) or a building notice, and you get a completion certificate at the end.

New fabric must meet Approved Document L (2021 edition incorporating 2023 amendments): walls 0.18, roof 0.15 and floor 0.18 W/m²K, windows 1.4 W/m²K or Band B. Under the simple route, new windows, doors and rooflights should not exceed 25% of the extension floor area plus any openings removed; more glass is possible with a whole-house calculation.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent.

Where in Lincolnshire do we work?

FAQ

Questions people ask

Full plans or building notice?

Full plans for most extensions: the design is checked before work starts. A building notice suits only simple jobs.

Who inspects the work?

The council's building control team or a registered building control approver (in Scotland, the council's building standards team).

What is a completion certificate?

The document confirming the work meets the regulations. Keep it; buyers' solicitors ask for it.

Do you cover all of Lincolnshire?

We cover 17 towns and districts in Lincolnshire, including Lincoln, Grimsby and Scunthorpe.

Who builds the extension?

Vetted building teams working under contract to us; your contract is with S&K Property Investments and Improvement Ltd.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price