Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Aberdeen, Aberdeen and Aberdeenshire

Wraparound extension in Aberdeen

Thinking about a wraparound extension in Aberdeen? An L-shaped extension that fills the side return and runs across the back. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

We cover Aberdeen (AB12, AB15, AB16 and AB23) as part of our Aberdeen and Aberdeenshire work. In Aberdeen we usually draw the wraparound and a simpler rear-only option side by side, so the planning risk and cost difference are clear.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Aberdeen?

A wraparound extension in Aberdeen is priced at £2,090–£3,420 per square metre including VAT as a guide, before kitchen fit-out and fees. Prices in Scotland sit a little below our West Midlands baseline; building warrant fees and drawings are budgeted separately.

Wraparound extension prices in Aberdeen
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£46,000–£75,000
L-shaped, about 30 m² of new floor£62,500–£102,500

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a wraparound extension in Aberdeen?

Planning for a wraparound extension in Aberdeen follows the Scottish householder rules.

In Scotland side extensions are more restricted than rear ones under householder permitted development, and wraparounds generally need planning permission. A building warrant is required before work starts.

Scotland has no Party Wall Act. Work to shared walls is governed by property law and the title deeds, so we agree access and protection with neighbours in writing before work begins.

Classes 1A and 1B do not apply in conservation areas, and listed buildings need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development or a planning application, plus the building warrant.

What are homes in Aberdeen like to extend?

Aberdeen has sandstone tenements, terraced houses and villas closer in, with post-war semis and newer estates further out. Tenement and other flats need planning permission for an extension, and every project needs a building warrant before work starts.

How a wraparound extension in Aberdeen comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for the building warrant.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the accepted completion certificate.

Wraparound extensions near Aberdeen

From Aberdeen, the nearest places we also cover are Nigg (1.9 miles) and Westhill (6.8 miles).

Other work in Aberdeen:

All rear extensions in Aberdeen

FAQ

Wraparound extension questions in Aberdeen

Do I need a party wall agreement?

Scotland has no Party Wall Act; we agree access and protection with your neighbour in writing instead.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

What roof suits a wraparound?

A flat roof with a lantern, a standing-seam pitched roof or a glazed roof over the side leg. The choice usually follows the first-floor windows above.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

How long does a rear extension take to build in Aberdeen?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price