Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Yateley, Hampshire

Terraced house rear extension in Yateley

Rear and side return extensions for terraces, with access through the house and two neighbours. We design, get the approvals for and build rear extensions for terraced houses in Yateley and the surrounding area, with one contract from the first survey to building control sign-off.

We cover Yateley (GU46) as part of our Hampshire work. Terraced streets make up much of the housing in parts of Hampshire, and most rear extensions here go in without side access.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a terraced house rear extension cost in Yateley?

Guide prices for a terraced house rear extension in Yateley start from our South East England rate of £2,300–£3,700 per square metre, including VAT. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Terraced house rear extension prices in Yateley
SizeGuide price inc VAT
3 m wide × 4.5 m deep (13.5 m²)£31,000–£50,000
3 m wide × 6 m deep (18 m²)£41,500–£66,500

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission for a terraced house rear extension in Yateley?

Here is how the rules in England apply to a terraced house rear extension in Yateley.

English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Yateley like to extend?

Around Yateley the housing ranges from inter-war semis to 1960s and 1970s estates with good-sized gardens. Many of the newer estates had permitted development rights removed by condition, so we check the planning history before anything is drawn.

How a terraced house rear extension in Yateley comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Terraced house rear extensions near Yateley

From Yateley, the nearest places we also cover are Sandhurst (1.9 miles) and Crowthorne (2.5 miles).

Other work in Yateley:

All rear extensions in Yateley

FAQ

Terraced house rear extension questions in Yateley

Is the site visit in Yateley free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

How do you keep the house clean?

Dust screens, floor protection and a single protected route through the house.

How long does a rear extension take to build in Yateley?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do you handle building control in Yateley?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price