Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Sandhurst, Berkshire

Terraced house rear extension in Sandhurst

Rear and side return extensions for terraces, with access through the house and two neighbours. If you live in Sandhurst and want to know what a terraced house rear extension would cost and whether it needs planning, start with the online guide price or a free site visit.

Sandhurst is covered from our Berkshire round, including GU47. Terraced streets make up much of the housing in parts of Berkshire, and most rear extensions here go in without side access.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a terraced house rear extension cost in Sandhurst?

For Sandhurst we work from the South East England rate: £2,300–£3,700 per square metre of new floor, including VAT, standard specification. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Terraced house rear extension prices in Sandhurst
SizeGuide price inc VAT
3 m wide × 4.5 m deep (13.5 m²)£31,000–£50,000
3 m wide × 6 m deep (18 m²)£41,500–£66,500

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission for a terraced house rear extension in Sandhurst?

Whether your terraced house rear extension in Sandhurst needs a planning application depends on its size, your house and any local restrictions.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Sandhurst like to extend?

Around Sandhurst the housing ranges from inter-war semis to 1960s and 1970s estates with good-sized gardens. Many of the newer estates had permitted development rights removed by condition, so we check the planning history before anything is drawn.

How a terraced house rear extension in Sandhurst comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Terraced house rear extensions near Sandhurst

Neighbouring places we cover include Crowthorne (1.6 miles) and Yateley (1.9 miles).

Other work in Sandhurst:

All rear extensions in Sandhurst

FAQ

Terraced house rear extension questions in Sandhurst

How long does a rear extension take to build in Sandhurst?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Can you build without side access?

Yes. Materials come through the house in protected runs or over the roof by crane on tight sites.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Do you handle building control in Sandhurst?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price