Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Kingston upon Hull, East Riding of Yorkshire

Rear extension planning drawings in Kingston upon Hull

For homes in Kingston upon Hull, a rear extension is often the simplest way to gain space without moving. Measured survey, design options, planning drawings and the application, handled for you. We take it from survey to completion certificate.

Kingston upon Hull is covered from our East Riding of Yorkshire round, including HU1, HU2 and HU3. For Kingston upon Hull homes we start with a measured survey, then draw options before anything is submitted.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

What do rear extension planning drawings cost in Kingston upon Hull?

As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. A householder planning application in England costs £548 (£575 for applications made from 8 December 2026), and a lawful development certificate for proposed work costs half the householder fee. We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a rear extension in Kingston upon Hull?

The planning route for a rear extension in Kingston upon Hull is set by England's householder rules and your council.

A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.

Councils aim to decide householder applications within 8 weeks of validation, and prior approval within 42 days.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Kingston upon Hull like to extend?

Kingston upon Hull has through terraces and some back-to-backs as well as later semis; back-to-backs have little or no rear space, so we look at side or loft options there.

How a rear extension in Kingston upon Hull comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Rear extension planning drawings near Kingston upon Hull

From Kingston upon Hull, the nearest places we also cover are Hedon (5.7 miles) and Barton upon Humber (5.9 miles).

Other work in Kingston upon Hull:

All rear extensions in Kingston upon Hull

FAQ

Rear extension planning drawings questions in Kingston upon Hull

How long does a rear extension take to build in Kingston upon Hull?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can you match the brick or stone on my Kingston upon Hull house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Do I need an architect?

You need accurate drawings by someone who knows householder planning; we provide them.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price