Living at home during a rear extension build

How to stay in your house while a rear extension is built: the temporary kitchen, dust, noise, security and the knock-through week.

Living at home during a rear extension build

Can you stay at home?

Most families do. The extension is built from the garden side, and the back wall is only opened once the new room is weathertight, so the disruption inside is concentrated in the final weeks.

Setting up a temporary kitchen

A kettle, microwave, fridge and a table in another room carry most households through. If the kitchen is being moved, plan for four to six weeks without a sink, or use a utility tap.

Dust, noise and security

Expect noise in working hours, especially during groundworks and the knock-through. Dust screens, floor protection and a single protected route through the house keep the rest of the home clean. The back of the house is secured with temporary doors or boarding when the wall comes out.

About this guide

Written by the Rear Extensions design team and checked against GOV.UK, Welsh and Scottish Government and Northern Ireland guidance in November 2026. It is general guidance, not legal advice; we confirm the rules for your house at the survey.

Add us as a preferred source on Google

FAQ

Quick answers

What hours do builders work?

Usually 8am to 5pm on weekdays; councils can set limits on noisy work.

Do I need to tell my insurer?

Yes, tell your home insurer before work starts.