Dromore, County Tyrone
Bungalow rear extension in Dromore
We plan and build rear extensions for bungalows for homeowners in Dromore. Single-storey rear extensions that keep everything on one level. Start with a free site visit, then a written price once the design is agreed.
Dromore is covered from our County Tyrone round, including BT78. For bungalows in County Tyrone, a rear extension is the usual way to add space without adding stairs.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a bungalow rear extension cost in Dromore?
In Dromore, our guide for a bungalow rear extension is £1,610–£2,610 per square metre including VAT for a standard specification. Northern Ireland prices are the lowest in our range.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4 m deep (12 m²) | £19,500–£31,500 |
| 4 m wide × 6 m deep (24 m²) | £38,500–£62,500 |
Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.
Do you need planning permission for a bungalow rear extension in Dromore?
Here is how the rules in Northern Ireland apply to a bungalow rear extension in Dromore.
In Northern Ireland the Planning (General Permitted Development) Order (Northern Ireland) 2015 allows a single-storey rear extension of up to 3 metres on an attached house or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary. Building control approval from the council is still required.
Northern Ireland has no larger-extension prior approval route; anything beyond permitted development needs a planning application.
Conservation areas, Areas of Outstanding Natural Beauty and listed buildings restrict permitted development in Northern Ireland. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Dromore like to extend?
Dromore has terraces near the centre, semis on the edges and many detached houses and bungalows in the surrounding countryside, where plots are often generous.
How a bungalow rear extension in Dromore comes together
Survey visit
We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.
Design and guide price
Two or three layout options with a guide price for each, so you choose the design knowing what it costs.
Approvals
Permitted development check or planning application, then building control drawings to the Northern Ireland Technical Booklets and structural calculations, plus a written agreement with neighbours for any shared-wall work.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Bungalow rear extensions near Dromore
Neighbouring places we cover include Omagh (8.7 miles) and Enniskillen (13.7 miles).
- Bungalow rear extension in Omagh
- Bungalow rear extension in Enniskillen
- Bungalow rear extension in Strabane
- Bungalow rear extension in Dungannon
- Bungalow rear extension in Cookstown
Other work in Dromore:
FAQ
Bungalow rear extension questions in Dromore
Do I need a party wall agreement?
Northern Ireland has no Party Wall Act; we agree any shared-wall work with your neighbour in writing.
How long does a rear extension take to build in Dromore?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Is a bungalow extension cheaper?
The rates are similar per square metre; roof work can add a little.
Who will build my extension?
Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.
Do you handle building control in Dromore?
Yes. We apply to the council's building control team and hand over the completion certificate.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.