Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Guiseley, West Yorkshire

Wraparound extension in Guiseley

Wraparound extension in Guiseley: an L-shaped extension that fills the side return and runs across the back. We measure the house, show you what the rules allow, price it in writing and build it.

Guiseley sits in West Yorkshire, with postcode districts including LS19 and LS20. Wraparound projects around Guiseley often involve two neighbours, so we start the party wall conversations early.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Guiseley?

In Guiseley, our guide for a wraparound extension is £2,050–£3,350 per square metre including VAT for a standard specification. Yorkshire prices sit below our West Midlands baseline; matching natural stone is the main variable.

Wraparound extension prices in Guiseley
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£45,000–£73,500
L-shaped, about 30 m² of new floor£61,500–£100,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a wraparound extension in Guiseley?

Here is how the rules in England apply to a wraparound extension in Guiseley.

Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Guiseley like to extend?

Guiseley has through terraces and some back-to-backs as well as later semis; back-to-backs have little or no rear space, so we look at side or loft options there.

How a wraparound extension in Guiseley comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Wraparound extensions near Guiseley

From Guiseley, the nearest places we also cover are Yeadon (1.3 miles) and Otley (2.2 miles).

Other work in Guiseley:

All rear extensions in Guiseley

FAQ

Wraparound extension questions in Guiseley

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Will it take a lot of garden?

Less than a deep rear extension of the same area, because part of the space comes from the side passage.

How long does a rear extension take to build in Guiseley?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Is the site visit in Guiseley free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price