Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Guiseley, West Yorkshire

Side return extension in Guiseley

Infilling the narrow passage beside a Victorian or Edwardian back addition. If you live in Guiseley and want to know what a side return extension would cost and whether it needs planning, start with the online guide price or a free site visit.

Guiseley sits in West Yorkshire, with postcode districts including LS19 and LS20. In Guiseley we check the boundary line and the neighbour's gutter before drawing a side return, because a few centimetres decide whether the wall goes on or beside the boundary.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Guiseley?

For Guiseley we work from the Yorkshire and the Humber rate: £2,140–£3,530 per square metre of new floor, including VAT, standard specification. Yorkshire prices sit below our West Midlands baseline; matching natural stone is the main variable.

Side return extension prices in Guiseley
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£25,500–£42,500
2.5 m wide × 7 m deep (17.5 m²)£37,500–£62,000

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a side return extension in Guiseley?

The planning route for a side return extension in Guiseley is set by England's householder rules and your council.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Guiseley like to extend?

Stone terraces and brick semis are typical of Guiseley. Matching sandstone or gritstone on a terrace is one of the biggest cost variables, and reclaimed stone is often the best match.

How a side return extension in Guiseley comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Side return extensions near Guiseley

Neighbouring places we cover include Yeadon (1.3 miles) and Otley (2.2 miles).

Other work in Guiseley:

All rear extensions in Guiseley

FAQ

Side return extension questions in Guiseley

Can you match the brick or stone on my Guiseley house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Do I need my neighbour's permission?

Not their permission, but in England and Wales you must serve party wall notices, and a neighbour can consent in writing or ask for a surveyor's award.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

How long does a rear extension take to build in Guiseley?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need planning permission for a rear extension in Guiseley?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price