Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Burnage, Greater Manchester

Wraparound extension in Burnage

An L-shaped extension that fills the side return and runs across the back. We design, get the approvals for and build wraparound extensions in Burnage and the surrounding area, with one contract from the first survey to building control sign-off.

Burnage and its postcode districts M14, M19 and M20 are part of our Greater Manchester coverage. Wraparounds are the natural next step for the end-of-terrace and Victorian houses in Greater Manchester where a side return alone would leave the room too narrow.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Burnage?

Guide prices for a wraparound extension in Burnage start from our North West England rate of £2,070–£3,380 per square metre, including VAT. North West prices sit below our West Midlands baseline; access on terraced streets is the main variable.

Wraparound extension prices in Burnage
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£45,500–£74,500
L-shaped, about 30 m² of new floor£62,000–£101,500

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission for a wraparound extension in Burnage?

Whether your wraparound extension in Burnage needs a planning application depends on its size, your house and any local restrictions.

Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Burnage like to extend?

Stone and brick terraces are common around Burnage. Where houses back onto a ginnel or alley, deliveries can come in from the rear, which makes the build tidier.

How a wraparound extension in Burnage comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Wraparound extensions near Burnage

Close by, we work in Fallowfield, about 0.8 miles away, and Didsbury, about 1.7 miles away.

Other work in Burnage:

All rear extensions in Burnage

FAQ

Wraparound extension questions in Burnage

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

What roof suits a wraparound?

A flat roof with a lantern, a standing-seam pitched roof or a glazed roof over the side leg. The choice usually follows the first-floor windows above.

What postcode areas do you cover around Burnage?

Including M14, M19 and M20, and the surrounding Greater Manchester area.

How long does a rear extension take to build in Burnage?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

How much does a wraparound extension cost in Burnage?

As a guide, £2,070–£3,380 per square metre including VAT for a standard specification. For example, L-shaped, about 22 m² of new floor: about £45,500–£74,500 at that rate. Your written price follows the survey.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price