Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Essex

Wraparound extensions in Essex

An L-shaped extension that fills the side return and runs across the back. Rear extensions in Essex: we cover 32 towns including Southend-on-Sea, Basildon and Colchester, with design, approvals and the build under one contract.

L-shaped wraparound extension with a standing seam roof and large corner glazing on a Victorian end-of-terrace house

In Southend-on-Sea we usually draw the wraparound and a simpler rear-only option side by side, so the planning risk and cost difference are clear. Essex mixes Victorian terraces with 1930s semis, so both side returns and full-width kitchen extensions suit houses here.

How much does a wraparound extension cost in Essex?

Guide prices for a wraparound extension in Essex start from our East of England rate of £2,330–£3,820 per square metre, including VAT. East of England prices run slightly above our West Midlands baseline; clay soils near trees are the main foundation variable.

Wraparound extension guide prices in Essex
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£51,500–£84,000
L-shaped, about 30 m² of new floor£70,000–£114,500

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission in Essex?

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent.

Where in Essex do we work?

FAQ

Questions people ask

Does a wraparound need planning permission?

Often yes, because the side and rear parts are judged together. Some fit within permitted development; we check before drawing.

How long does a wraparound take?

Usually 14 to 20 weeks on site, longer than a plain rear extension because of the steelwork.

Can the corner be all glass?

Yes, with a steel or aluminium post or a structural glass corner. It needs careful thermal detailing to meet Building Regulations.

Do you cover all of Essex?

We cover 32 towns and districts in Essex, including Southend-on-Sea, Basildon and Colchester.

Who builds the extension?

Vetted building teams working under contract to us; your contract is with S&K Property Investments and Improvement Ltd.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price