Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Grays, Essex

Wraparound extension in Grays

An L-shaped extension that fills the side return and runs across the back. We design, get the approvals for and build wraparound extensions in Grays and the surrounding area, with one contract from the first survey to building control sign-off.

We cover Grays (RM16, RM17 and RM20) as part of our Essex work. Wraparound projects around Grays often involve two neighbours, so we start the party wall conversations early.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Grays?

In Grays, our guide for a wraparound extension is £2,330–£3,820 per square metre including VAT for a standard specification. East of England prices run slightly above our West Midlands baseline; clay soils near trees are the main foundation variable.

Wraparound extension prices in Grays
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£51,500–£84,000
L-shaped, about 30 m² of new floor£70,000–£114,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a wraparound extension in Grays?

Whether your wraparound extension in Grays needs a planning application depends on its size, your house and any local restrictions.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Grays like to extend?

Post-war semis and newer estates are typical of Grays, and many have room for a full-width extension. Shrinkable clay is common in the East of England, so foundations near trees and hedges are designed to NHBC-style depth guidance.

How a wraparound extension in Grays comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Wraparound extensions near Grays

Close by, we work in Chafford Hundred, about 1.6 miles away, and Tilbury, about 1.7 miles away.

Other work in Grays:

All rear extensions in Grays

FAQ

Wraparound extension questions in Grays

Do you handle building control in Grays?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

What postcode areas do you cover around Grays?

Including RM16, RM17 and RM20, and the surrounding Essex area.

How long does a wraparound take?

Usually 14 to 20 weeks on site, longer than a plain rear extension because of the steelwork.

Do I need planning permission for a rear extension in Grays?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Can you match the brick or stone on my Grays house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Is the site visit in Grays free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price