Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Dunbar, Edinburgh and the Lothians

Wraparound extension in Dunbar

We plan and build wraparound extensions for homeowners in Dunbar. An L-shaped extension that fills the side return and runs across the back. Start with a free site visit, then a written price once the design is agreed.

Dunbar and its postcode districts EH42 are part of our Edinburgh and the Lothians coverage. Wraparounds are the natural next step for the end-of-terrace and Victorian houses in Edinburgh and the Lothians where a side return alone would leave the room too narrow.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Dunbar?

A wraparound extension in Dunbar is priced at £2,090–£3,420 per square metre including VAT as a guide, before kitchen fit-out and fees. Prices in Scotland sit a little below our West Midlands baseline; building warrant fees and drawings are budgeted separately.

Wraparound extension prices in Dunbar
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£46,000–£75,000
L-shaped, about 30 m² of new floor£62,500–£102,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a wraparound extension in Dunbar?

Here is how the rules in Scotland apply to a wraparound extension in Dunbar.

In Scotland side extensions are more restricted than rear ones under householder permitted development, and wraparounds generally need planning permission. A building warrant is required before work starts.

Scotland has no Party Wall Act. Work to shared walls is governed by property law and the title deeds, so we agree access and protection with neighbours in writing before work begins.

Classes 1A and 1B do not apply in conservation areas, and listed buildings need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Dunbar like to extend?

Dunbar has sandstone villas and terraces, post-war semis and four-in-a-block flats. Flats need planning permission for an extension, and every project needs a building warrant before work starts.

How a wraparound extension in Dunbar comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Paperwork handled

    Planning or permitted development, the building warrant, structural design and neighbour agreements are all handled by us.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the accepted completion certificate.

Wraparound extensions near Dunbar

We also build wraparound extensions in nearby Tranent (17.4 miles) and Musselburgh (21.1 miles).

Other work in Dunbar:

All rear extensions in Dunbar

FAQ

Wraparound extension questions in Dunbar

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Do you handle building control in Dunbar?

Yes. We apply for the building warrant before work starts and submit the completion certificate at the end.

What roof suits a wraparound?

A flat roof with a lantern, a standing-seam pitched roof or a glazed roof over the side leg. The choice usually follows the first-floor windows above.

Can you match the brick or stone on my Dunbar house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

How long does a rear extension take to build in Dunbar?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need a party wall agreement?

Scotland has no Party Wall Act; we agree access and protection with your neighbour in writing instead.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price