Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Dalkeith, Edinburgh and the Lothians

Wraparound extension in Dalkeith

Thinking about a wraparound extension in Dalkeith? An L-shaped extension that fills the side return and runs across the back. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

Dalkeith is covered from our Edinburgh and the Lothians round, including EH22. In Dalkeith we usually draw the wraparound and a simpler rear-only option side by side, so the planning risk and cost difference are clear.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Dalkeith?

A wraparound extension in Dalkeith is priced at £2,090–£3,420 per square metre including VAT as a guide, before kitchen fit-out and fees. Prices in Scotland sit a little below our West Midlands baseline; building warrant fees and drawings are budgeted separately.

Wraparound extension prices in Dalkeith
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£46,000–£75,000
L-shaped, about 30 m² of new floor£62,500–£102,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a wraparound extension in Dalkeith?

The planning route for a wraparound extension in Dalkeith is set by Scotland's householder rules and your council.

In Scotland side extensions are more restricted than rear ones under householder permitted development, and wraparounds generally need planning permission. A building warrant is required before work starts.

Scotland has no Party Wall Act. Work to shared walls is governed by property law and the title deeds, so we agree access and protection with neighbours in writing before work begins.

Classes 1A and 1B do not apply in conservation areas, and listed buildings need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Dalkeith like to extend?

Post-war semis and terraces are common around Dalkeith, and many have room for a single-storey rear extension within Class 1A limits.

How a wraparound extension in Dalkeith comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for the building warrant.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the accepted completion certificate.

Wraparound extensions near Dalkeith

Close by, we work in Mayfield, about 1.9 miles away, and Bonnyrigg, about 2.0 miles away.

Other work in Dalkeith:

All rear extensions in Dalkeith

FAQ

Wraparound extension questions in Dalkeith

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Do you handle building control in Dalkeith?

Yes. We apply for the building warrant before work starts and submit the completion certificate at the end.

Does a wraparound need planning permission?

Often yes, because the side and rear parts are judged together. Some fit within permitted development; we check before drawing.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

How long does a rear extension take to build in Dalkeith?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need a party wall agreement?

Scotland has no Party Wall Act; we agree access and protection with your neighbour in writing instead.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price