Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Hedon, East Riding of Yorkshire

Wraparound extension in Hedon

We plan and build wraparound extensions for homeowners in Hedon. An L-shaped extension that fills the side return and runs across the back. Start with a free site visit, then a written price once the design is agreed.

We cover Hedon (HU12) as part of our East Riding of Yorkshire work. In Hedon we usually draw the wraparound and a simpler rear-only option side by side, so the planning risk and cost difference are clear.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Hedon?

For Hedon we work from the Yorkshire and the Humber rate: £2,050–£3,350 per square metre of new floor, including VAT, standard specification. Yorkshire prices sit below our West Midlands baseline; matching natural stone is the main variable.

Wraparound extension prices in Hedon
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£45,000–£73,500
L-shaped, about 30 m² of new floor£61,500–£100,500

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission for a wraparound extension in Hedon?

Here is how the rules in England apply to a wraparound extension in Hedon.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Hedon like to extend?

Stone terraces and brick semis are typical of Hedon. Matching sandstone or gritstone on a terrace is one of the biggest cost variables, and reclaimed stone is often the best match.

How a wraparound extension in Hedon comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Wraparound extensions near Hedon

Close by, we work in Kingston upon Hull, about 5.7 miles away, and Immingham, about 8.7 miles away.

Other work in Hedon:

All rear extensions in Hedon

FAQ

Wraparound extension questions in Hedon

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

What postcode areas do you cover around Hedon?

Including HU12, and the surrounding East Riding of Yorkshire area.

How long does a wraparound take?

Usually 14 to 20 weeks on site, longer than a plain rear extension because of the steelwork.

Do I need planning permission for a rear extension in Hedon?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

How long does a rear extension take to build in Hedon?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price