Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Chesterfield, Derbyshire

Terraced house rear extension in Chesterfield

Terraced house rear extension in Chesterfield: rear and side return extensions for terraces, with access through the house and two neighbours. We measure the house, show you what the rules allow, price it in writing and build it.

We cover Chesterfield (S40 and S41) as part of our Derbyshire work. In Chesterfield we plan the delivery route through the house and the skip licence before anything else.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a terraced house rear extension cost in Chesterfield?

Guide prices for a terraced house rear extension in Chesterfield start from our East Midlands rate of £1,990–£3,200 per square metre, including VAT. East Midlands prices sit a little below our West Midlands baseline.

Terraced house rear extension prices in Chesterfield
SizeGuide price inc VAT
3 m wide × 4.5 m deep (13.5 m²)£27,000–£43,000
3 m wide × 6 m deep (18 m²)£36,000–£57,500

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a terraced house rear extension in Chesterfield?

Planning for a terraced house rear extension in Chesterfield follows the English householder rules.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Chesterfield like to extend?

Red-brick terraces and semis are typical of Chesterfield. Coal-mining legacy areas in parts of the East Midlands can need a Coal Authority check before foundations are designed.

How a terraced house rear extension in Chesterfield comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Terraced house rear extensions near Chesterfield

Close by, we work in Staveley, about 3.0 miles away, and Dronfield, about 4.3 miles away.

Other work in Chesterfield:

All rear extensions in Chesterfield

FAQ

Terraced house rear extension questions in Chesterfield

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Can you build without side access?

Yes. Materials come through the house in protected runs or over the roof by crane on tight sites.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

How long does a rear extension take to build in Chesterfield?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

What postcode areas do you cover around Chesterfield?

Including S40 and S41, and the surrounding Derbyshire area.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price