Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Aberystwyth, West Wales

Side return extension in Aberystwyth

Side return extension in Aberystwyth: infilling the narrow passage beside a Victorian or Edwardian back addition. We measure the house, show you what the rules allow, price it in writing and build it.

We cover Aberystwyth (SY23) as part of our West Wales work. Side return projects in Aberystwyth usually start with a drainage survey of the side passage.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Aberystwyth?

Guide prices for a side return extension in Aberystwyth start from our Wales rate of £2,140–£3,530 per square metre, including VAT. Prices in Wales sit below our West Midlands baseline; sloping sites are the main variable.

Side return extension prices in Aberystwyth
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£25,500–£42,500
2.5 m wide × 7 m deep (17.5 m²)£37,500–£62,000

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a side return extension in Aberystwyth?

Whether your side return extension in Aberystwyth needs a planning application depends on its size, your house and any local restrictions.

Welsh side-extension rules limit a single-storey side addition to 4 metres high and a 50% increase in the width of the original house, with tighter limits in conservation areas. Wraparounds usually need a planning application.

In Wales, as in England, the Party Wall etc. Act 1996 requires notice to neighbours before work to a shared wall or excavation near their foundations.

Conservation areas, National Parks and National Landscapes restrict permitted development in Wales, and listed buildings need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Aberystwyth like to extend?

Older terraces near the centre and post-war semis further out are typical of Aberystwyth. Sloping sites are common in Wales, so floor levels and retaining walls are designed at the start.

How a side return extension in Aberystwyth comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Approvals

    Permitted development check or householder planning application, then Building Regulations drawings to the Welsh Approved Documents and structural calculations, plus party wall notices where they apply.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Side return extensions near Aberystwyth

Close by, we work in Llandrindod Wells, about 32.1 miles away, and Newtown, about 33.7 miles away.

Other work in Aberystwyth:

All rear extensions in Aberystwyth

FAQ

Side return extension questions in Aberystwyth

Do you handle building control in Aberystwyth?

Yes. We apply to the council or a registered approver under the Welsh regulations and hand over the completion certificate.

Do I need a party wall agreement?

In Wales, usually yes if the extension is on or near a shared boundary or close to a neighbour's foundations. We serve the notices.

Can I combine a side return with a rear extension?

Yes; that is a wraparound extension, and it gives the biggest open-plan room a terrace can have.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

How long does a rear extension take to build in Aberystwyth?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price