Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Aberystwyth, West Wales

Single-storey rear extension in Aberystwyth

We plan and build single-storey rear extensions for homeowners in Aberystwyth. Ground-floor space across the back of the house, usually for a kitchen, dining or family room. Start with a free site visit, then a written price once the design is agreed.

Aberystwyth sits in West Wales, with postcode districts including SY23. On Victorian terraces and semis like those around Aberystwyth, a single-storey rear extension is usually the simplest way to fix a small back kitchen without touching the bedrooms.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a single-storey rear extension cost in Aberystwyth?

In Aberystwyth, our guide for a single-storey rear extension is £1,770–£2,880 per square metre including VAT for a standard specification. Prices in Wales sit below our West Midlands baseline; sloping sites are the main variable.

Single-storey rear extension prices in Aberystwyth
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£21,000–£34,500
4 m wide × 5 m deep (20 m²)£35,500–£57,500
4 m wide × 6 m deep (24 m²)£42,500–£69,000

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a single-storey rear extension in Aberystwyth?

Here is how the rules in Wales apply to a single-storey rear extension in Aberystwyth.

Welsh permitted development allows a single-storey rear extension of up to 4 metres in depth and 4 metres in height, subject to boundary and garden-coverage limits. There is no larger-extension prior approval scheme in Wales.

Conservation areas, National Parks and National Landscapes restrict permitted development in Wales, and listed buildings need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Aberystwyth like to extend?

Aberystwyth has Victorian terraces near the centre and semis further out. Welsh permitted development allows up to 4 metres at the rear for many houses.

How a single-storey rear extension in Aberystwyth comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Paperwork handled

    Planning or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Single-storey rear extensions near Aberystwyth

Close by, we work in Llandrindod Wells, about 32.1 miles away, and Newtown, about 33.7 miles away.

Other work in Aberystwyth:

All rear extensions in Aberystwyth

FAQ

Single-storey rear extension questions in Aberystwyth

How long does a rear extension take to build in Aberystwyth?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need planning permission for a rear extension in Aberystwyth?

Often not for a single-storey rear extension of up to 4 metres under Welsh permitted development. Wales has no prior approval route for deeper extensions.

Will the extension make the room behind it dark?

Not if it is designed well. Rooflights or a lantern over the old back room, and a wide opening into it, keep daylight reaching the middle of the house.

Do you handle building control in Aberystwyth?

Yes. We apply to the council or a registered approver under the Welsh regulations and hand over the completion certificate.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Do I need a party wall agreement?

In Wales, usually yes if the extension is on or near a shared boundary or close to a neighbour's foundations. We serve the notices.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price