Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Kingswinford, West Midlands

Side return extension in Kingswinford

Thinking about a side return extension in Kingswinford? Infilling the narrow passage beside a Victorian or Edwardian back addition. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

Kingswinford sits in the West Midlands, with postcode districts including DY5, DY6 and DY8. Side returns suit the Victorian and Edwardian terraces found across parts of the West Midlands, where the kitchen sits in a narrow back addition.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Kingswinford?

A side return extension in Kingswinford is priced at £2,300–£3,800 per square metre including VAT as a guide, before kitchen fit-out and fees. The West Midlands is the baseline for our guide prices.

Side return extension prices in Kingswinford
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£27,500–£45,500
2.5 m wide × 7 m deep (17.5 m²)£40,500–£66,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a side return extension in Kingswinford?

Whether your side return extension in Kingswinford needs a planning application depends on its size, your house and any local restrictions.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Kingswinford like to extend?

Kingswinford has a lot of post-war semis and estate houses with long gardens and side access, which makes rear extensions quicker to build.

How a side return extension in Kingswinford comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Side return extensions near Kingswinford

Close by, we work in Brierley Hill, about 2.3 miles away, and Wombourne, about 2.5 miles away.

Other work in Kingswinford:

All rear extensions in Kingswinford

FAQ

Side return extension questions in Kingswinford

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

How long does a rear extension take to build in Kingswinford?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Glass roof or solid roof with rooflights?

A glass roof gives the most light; a solid roof with long rooflights is warmer and quieter in rain. Both work.

Do you handle building control in Kingswinford?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price