Dudley, West Midlands
Side return extension in Dudley
Infilling the narrow passage beside a Victorian or Edwardian back addition. We design, get the approvals for and build side return extensions in Dudley and the surrounding area, with one contract from the first survey to building control sign-off.
Dudley is covered from our West Midlands round, including DY1, DY2, DY3 and DY5. In Dudley we check the boundary line and the neighbour's gutter before drawing a side return, because a few centimetres decide whether the wall goes on or beside the boundary.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a side return extension cost in Dudley?
For Dudley we work from the West Midlands rate: £2,300–£3,800 per square metre of new floor, including VAT, standard specification. The West Midlands is the baseline for our guide prices.
| Size | Guide price inc VAT |
|---|---|
| 2 m wide × 6 m deep (12 m²) | £27,500–£45,500 |
| 2.5 m wide × 7 m deep (17.5 m²) | £40,500–£66,500 |
Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.
Do you need planning permission for a side return extension in Dudley?
Whether your side return extension in Dudley needs a planning application depends on its size, your house and any local restrictions.
Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.
The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Dudley like to extend?
Dudley has a lot of post-war semis and estate houses with long gardens and side access, which makes rear extensions quicker to build.
How a side return extension in Dudley comes together
Look round and measure
A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Paperwork handled
Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.
Build and sign-off
We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.
Side return extensions near Dudley
Close by, we work in Brierley Hill, about 2.0 miles away, and Tipton, about 2.1 miles away.
- Side return extension in Brierley Hill
- Side return extension in Tipton
- Side return extension in Oldbury
- Side return extension in Kingswinford
- Side return extension in Halesowen
Other work in Dudley:
FAQ
Side return extension questions in Dudley
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
Do I need planning permission for a rear extension in Dudley?
Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.
Glass roof or solid roof with rooflights?
A glass roof gives the most light; a solid roof with long rooflights is warmer and quieter in rain. Both work.
How long does a rear extension take to build in Dudley?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Can I get a price without a visit?
Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.
Do you handle building control in Dudley?
Yes. We apply to the council or a registered building control approver and hand over the completion certificate.