Dudley, West Midlands
Wraparound extension in Dudley
An L-shaped extension that fills the side return and runs across the back. If you live in Dudley and want to know what a wraparound extension would cost and whether it needs planning, start with the online guide price or a free site visit.
Dudley and its postcode districts DY1, DY2, DY3 and DY5 are part of our West Midlands coverage. Wraparounds are the natural next step for the end-of-terrace and Victorian houses in the West Midlands where a side return alone would leave the room too narrow.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a wraparound extension cost in Dudley?
For Dudley we work from the West Midlands rate: £2,200–£3,600 per square metre of new floor, including VAT, standard specification. The West Midlands is the baseline for our guide prices.
| Size | Guide price inc VAT |
|---|---|
| L-shaped, about 22 m² of new floor | £48,500–£79,000 |
| L-shaped, about 30 m² of new floor | £66,000–£108,000 |
These are guide ranges; the written quote after the survey is the figure that counts.
Do you need planning permission for a wraparound extension in Dudley?
Whether your wraparound extension in Dudley needs a planning application depends on its size, your house and any local restrictions.
In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.
Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.
What are homes in Dudley like to extend?
Dudley has a lot of post-war semis and estate houses with long gardens and side access, which makes rear extensions quicker to build.
How a wraparound extension in Dudley comes together
Look round and measure
A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.
Design and guide price
Two or three layout options with a guide price for each, so you choose the design knowing what it costs.
Planning and regulations
We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.
Build and sign-off
We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.
Wraparound extensions near Dudley
Neighbouring places we cover include Brierley Hill (2.0 miles) and Tipton (2.1 miles).
- Wraparound extension in Brierley Hill
- Wraparound extension in Tipton
- Wraparound extension in Oldbury
- Wraparound extension in Kingswinford
- Wraparound extension in Halesowen
Other work in Dudley:
FAQ
Wraparound extension questions in Dudley
Who will build my extension?
Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.
Can I get a price without a visit?
Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.
How long does a wraparound take?
Usually 14 to 20 weeks on site, longer than a plain rear extension because of the steelwork.
Do I need planning permission for a rear extension in Dudley?
Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.
Do you handle building control in Dudley?
Yes. We apply to the council or a registered building control approver and hand over the completion certificate.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.