Ryde, Isle of Wight
Rear extension planning drawings in Ryde
Thinking about a rear extension in Ryde? Measured survey, design options, planning drawings and the application, handled for you. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.
Ryde sits in the Isle of Wight, with postcode districts including PO33 and PO34. For Ryde homes we start with a measured survey, then draw options before anything is submitted.
Ask about a site visit
Visits here are by arrangement; we'll confirm before booking.
Ryde is outside our regular coverage, so visits and projects here are by arrangement: we confirm whether we can take the job, and agree any travel costs, before the first visit.
What do rear extension planning drawings cost in Ryde?
As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. A householder planning application in England costs £548 (£575 for applications made from 8 December 2026), and a lawful development certificate for proposed work costs half the householder fee. Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.
Do you need planning permission for a rear extension in Ryde?
The planning route for a rear extension in Ryde is set by England's householder rules and your council.
England's rules allow a rear extension of more than one storey without an application only when it is no deeper than 3 metres and at least 7 metres from the boundary opposite the rear wall, and never on designated land. Most two-storey schemes need householder planning permission.
Councils aim to decide householder applications within 8 weeks of validation, and prior approval within 42 days.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.
What are homes in Ryde like to extend?
Ryde has a mix of Victorian terraces near the centre and larger Edwardian and inter-war houses further out. Clay soils across much of the South East mean deeper foundations near trees, which we plan for at the survey.
How a rear extension in Ryde comes together
Site visit by arrangement
We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Approvals
Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.
Fixed price and build
A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.
Rear extension planning drawings near Ryde
We also build rear extensions in nearby Sandown (5.4 miles) and East Cowes (5.8 miles).
- Rear extension planning drawings in Sandown
- Rear extension planning drawings in East Cowes
- Rear extension planning drawings in Newport
- Rear extension planning drawings in Cowes
- Rear extension planning drawings in Shanklin
Other work in Ryde:
FAQ
Rear extension planning drawings questions in Ryde
Can I get a price without a visit?
Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.
Who will build my extension?
Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.
What if planning is refused?
We review the reasons with you, amend and resubmit (often free of a second fee within 12 months in England) or appeal.
What postcode areas do you cover around Ryde?
Including PO33 and PO34, and the surrounding Isle of Wight area.
How long does a rear extension take to build in Ryde?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.