Camberley, Surrey
Kitchen-diner rear extension in Camberley
An open-plan kitchen, dining and family room that opens straight onto the garden. We design, get the approvals for and build kitchen-diner rear extensions in Camberley and the surrounding area, with one contract from the first survey to building control sign-off.
Camberley sits in Surrey, with postcode districts including GU15 and GU16. We usually keep the working kitchen where the old one was and put the dining table in the new space by the doors, which suits most Camberley homes.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a kitchen-diner rear extension cost in Camberley?
A kitchen-diner rear extension in Camberley is priced at £2,130–£3,470 per square metre including VAT as a guide, before kitchen fit-out and fees. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4 m deep (12 m²) | £25,500–£41,500 |
| 4 m wide × 5 m deep (20 m²) | £42,500–£69,500 |
| 4 m wide × 6 m deep (24 m²) | £51,000–£83,500 |
These are guide ranges; the written quote after the survey is the figure that counts.
Do you need planning permission for a kitchen-diner rear extension in Camberley?
Planning for a kitchen-diner rear extension in Camberley follows the English householder rules.
In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.
If 3 or 4 metres is not enough, England's prior approval route allows 6 metres on a terraced or semi-detached house and 8 metres on a detached house for a single-storey rear extension. Neighbours are consulted, the council decides within 42 days, and the fee is £249, rising to £310 from 8 December 2026.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.
What are homes in Camberley like to extend?
Camberley has a mix of Victorian terraces near the centre and larger Edwardian and inter-war houses further out. Clay soils across much of the South East mean deeper foundations near trees, which we plan for at the survey.
How a kitchen-diner rear extension in Camberley comes together
Free site visit
We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Planning and regulations
We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.
Build and sign-off
We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.
Kitchen-diner rear extensions near Camberley
We also build kitchen-diner rear extensions in nearby Frimley (1.4 miles) and Sandhurst (2.0 miles).
- Kitchen-diner rear extension in Frimley
- Kitchen-diner rear extension in Sandhurst
- Kitchen-diner rear extension in Farnborough
- Kitchen-diner rear extension in Crowthorne
- Kitchen-diner rear extension in Yateley
Other work in Camberley:
FAQ
Kitchen-diner rear extension questions in Camberley
Can I get a price without a visit?
Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.
Do I need a party wall agreement?
In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.
Do you fit the kitchen?
Yes, whether you buy it yourself or we supply it. We take the measurements from the built shell, not the drawings.
Who will build my extension?
Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.
How long does a rear extension take to build in Camberley?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Do you handle building control in Camberley?
Yes. We apply to the council or a registered building control approver and hand over the completion certificate.