Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Camberley, Surrey

Two-storey rear extension in Camberley

We plan and build two-storey rear extensions for homeowners in Camberley. A larger kitchen downstairs and an extra bedroom or bathroom upstairs, under one roof. Start with a free site visit, then a written price once the design is agreed.

Camberley sits in Surrey, with postcode districts including GU15 and GU16. Two-storey rear extensions suit semi-detached houses in Camberley best, where the extra bedroom matters as much as the bigger kitchen.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a two-storey rear extension cost in Camberley?

In Camberley, our guide for a two-storey rear extension is £2,020–£3,020 per square metre including VAT for a standard specification. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Two-storey rear extension prices in Camberley
SizeGuide price inc VAT
3 m × 5 m footprint, two floors (30 m²)£60,500–£90,500
4 m × 6 m footprint, two floors (48 m²)£97,000–£145,000

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a two-storey rear extension in Camberley?

The planning route for a two-storey rear extension in Camberley is set by England's householder rules and your council.

A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Camberley like to extend?

Around Camberley the housing ranges from inter-war semis to 1960s and 1970s estates with good-sized gardens. Many of the newer estates had permitted development rights removed by condition, so we check the planning history before anything is drawn.

How a two-storey rear extension in Camberley comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Two-storey rear extensions near Camberley

We also build two-storey rear extensions in nearby Frimley (1.4 miles) and Sandhurst (2.0 miles).

Other work in Camberley:

All rear extensions in Camberley

FAQ

Two-storey rear extension questions in Camberley

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

How long does a rear extension take to build in Camberley?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Is two-storey cheaper per square metre than single-storey?

Usually yes, because the foundations and roof are shared across twice the floor area. The total cost is higher.

Do I need planning permission for a rear extension in Camberley?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price