Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Morley, West Yorkshire

Bungalow rear extension in Morley

Bungalow rear extension in Morley: single-storey rear extensions that keep everything on one level. We measure the house, show you what the rules allow, price it in writing and build it.

Morley sits in West Yorkshire, with postcode districts including LS10, LS11 and LS27. For Morley bungalows we design the roof first, because the low eaves decide the height of the new room.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a bungalow rear extension cost in Morley?

For Morley we work from the Yorkshire and the Humber rate: £1,720–£2,790 per square metre of new floor, including VAT, standard specification. Yorkshire prices sit below our West Midlands baseline; matching natural stone is the main variable.

Bungalow rear extension prices in Morley
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£20,500–£33,500
4 m wide × 6 m deep (24 m²)£41,500–£67,000

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a bungalow rear extension in Morley?

Here is how the rules in England apply to a bungalow rear extension in Morley.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

If 3 or 4 metres is not enough, England's prior approval route allows 6 metres on a terraced or semi-detached house and 8 metres on a detached house for a single-storey rear extension. Neighbours are consulted, the council decides within 42 days, and the fee is £249, rising to £310 from 8 December 2026.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Morley like to extend?

Morley has through terraces and some back-to-backs as well as later semis; back-to-backs have little or no rear space, so we look at side or loft options there.

How a bungalow rear extension in Morley comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Bungalow rear extensions near Morley

Neighbouring places we cover include Batley (2.9 miles) and Dewsbury (3.6 miles).

Other work in Morley:

All rear extensions in Morley

FAQ

Bungalow rear extension questions in Morley

How long does a rear extension take to build in Morley?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Can a bungalow extension be fully accessible?

Yes: level thresholds, wider doors and a wet room are straightforward to design in.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Do I need planning permission for a rear extension in Morley?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price