Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Ossett, West Yorkshire

Bungalow rear extension in Ossett

Thinking about a bungalow rear extension in Ossett? Single-storey rear extensions that keep everything on one level. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

Ossett sits in West Yorkshire, with postcode districts including WF2, WF4 and WF5. For bungalows in West Yorkshire, a rear extension is the usual way to add space without adding stairs.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a bungalow rear extension cost in Ossett?

Guide prices for a bungalow rear extension in Ossett start from our Yorkshire and the Humber rate of £1,720–£2,790 per square metre, including VAT. Yorkshire prices sit below our West Midlands baseline; matching natural stone is the main variable.

Bungalow rear extension prices in Ossett
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£20,500–£33,500
4 m wide × 6 m deep (24 m²)£41,500–£67,000

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a bungalow rear extension in Ossett?

The planning route for a bungalow rear extension in Ossett is set by England's householder rules and your council.

In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.

If 3 or 4 metres is not enough, England's prior approval route allows 6 metres on a terraced or semi-detached house and 8 metres on a detached house for a single-storey rear extension. Neighbours are consulted, the council decides within 42 days, and the fee is £249, rising to £310 from 8 December 2026.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Ossett like to extend?

Stone terraces and brick semis are typical of Ossett. Matching sandstone or gritstone on a terrace is one of the biggest cost variables, and reclaimed stone is often the best match.

How a bungalow rear extension in Ossett comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Bungalow rear extensions near Ossett

Close by, we work in Horbury, about 1.6 miles away, and Dewsbury, about 2.1 miles away.

Other work in Ossett:

All rear extensions in Ossett

FAQ

Bungalow rear extension questions in Ossett

Do you handle building control in Ossett?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Do I need planning permission for a rear extension in Ossett?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Can I extend the loft as well?

Sometimes, but that is a different project; a rear extension keeps everything on one level.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

How long does a rear extension take to build in Ossett?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price