Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Camberley, Surrey

Bungalow rear extension in Camberley

Single-storey rear extensions that keep everything on one level. If you live in Camberley and want to know what a bungalow rear extension would cost and whether it needs planning, start with the online guide price or a free site visit.

Camberley sits in Surrey, with postcode districts including GU15 and GU16. For bungalows in Surrey, a rear extension is the usual way to add space without adding stairs.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a bungalow rear extension cost in Camberley?

A bungalow rear extension in Camberley is priced at £2,070–£3,360 per square metre including VAT as a guide, before kitchen fit-out and fees. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Bungalow rear extension prices in Camberley
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£25,000–£40,500
4 m wide × 6 m deep (24 m²)£49,500–£80,500

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a bungalow rear extension in Camberley?

Planning for a bungalow rear extension in Camberley follows the English householder rules.

English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.

England also has the larger home extension route: a single-storey rear extension of up to 6 metres on an attached house or 8 metres on a detached house, after prior approval from the council. The council notifies your neighbours and has 42 days to decide; the fee is £249 (£310 for applications made from 8 December 2026). The route is not available on designated land such as conservation areas.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Camberley like to extend?

Camberley has a mix of Victorian terraces near the centre and larger Edwardian and inter-war houses further out. Clay soils across much of the South East mean deeper foundations near trees, which we plan for at the survey.

How a bungalow rear extension in Camberley comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Bungalow rear extensions near Camberley

Neighbouring places we cover include Frimley (1.4 miles) and Sandhurst (2.0 miles).

Other work in Camberley:

All rear extensions in Camberley

FAQ

Bungalow rear extension questions in Camberley

Do I need planning permission for a rear extension in Camberley?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Can you match the brick or stone on my Camberley house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

How deep can I extend?

The same limits as a house: 3 or 4 metres in England, more with prior approval.

How long does a rear extension take to build in Camberley?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price