Bungalow rear extension in Doncaster
For homes in Doncaster, a bungalow rear extension is often the simplest way to gain space without moving. Single-storey rear extensions that keep everything on one level. We take it from survey to completion certificate.
We cover Doncaster (DN1, DN2, DN4 and DN5) as part of our South Yorkshire work. For Doncaster bungalows we design the roof first, because the low eaves decide the height of the new room.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a bungalow rear extension cost in Doncaster?
In Doncaster, our guide for a bungalow rear extension is £1,720–£2,790 per square metre including VAT for a standard specification. Yorkshire prices sit below our West Midlands baseline; matching natural stone is the main variable.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4 m deep (12 m²) | £20,500–£33,500 |
| 4 m wide × 6 m deep (24 m²) | £41,500–£67,000 |
These are guide ranges; the written quote after the survey is the figure that counts.
Do you need planning permission for a bungalow rear extension in Doncaster?
The planning route for a bungalow rear extension in Doncaster is set by England's householder rules and your council.
Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.
England also has the larger home extension route: a single-storey rear extension of up to 6 metres on an attached house or 8 metres on a detached house, after prior approval from the council. The council notifies your neighbours and has 42 days to decide; the fee is £249 (£310 for applications made from 8 December 2026). The route is not available on designated land such as conservation areas.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Doncaster like to extend?
Doncaster has through terraces and some back-to-backs as well as later semis; back-to-backs have little or no rear space, so we look at side or loft options there.
How a bungalow rear extension in Doncaster comes together
Look round and measure
A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Paperwork handled
Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.
Build and sign-off
We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.
Bungalow rear extensions near Doncaster
Neighbouring places we cover include Bentley (1.1 miles) and Armthorpe (3.3 miles).
- Bungalow rear extension in Bentley
- Bungalow rear extension in Armthorpe
- Bungalow rear extension in Kirk Sandall
- Bungalow rear extension in Adwick le Street
- Bungalow rear extension in Conisbrough
Other work in Doncaster:
FAQ
Bungalow rear extension questions in Doncaster
Can I get a price without a visit?
Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.
How much does a bungalow rear extension cost in Doncaster?
As a guide, £1,720–£2,790 per square metre including VAT for a standard specification. For example, 3 m wide × 4 m deep (12 m²): about £20,500–£33,500 at that rate. Your written price follows the survey.
Will the roof look odd?
Not if the pitch and tiles match. Where the eaves are low, a flat-roofed section with a lantern is an alternative.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
Do you handle building control in Doncaster?
Yes. We apply to the council or a registered building control approver and hand over the completion certificate.