Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Wednesbury, West Midlands

Wraparound extension in Wednesbury

We plan and build wraparound extensions for homeowners in Wednesbury. An L-shaped extension that fills the side return and runs across the back. Start with a free site visit, then a written price once the design is agreed.

We cover Wednesbury (B71, DY4 and WS10) as part of our West Midlands work. Wraparound projects around Wednesbury often involve two neighbours, so we start the party wall conversations early.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Wednesbury?

Guide prices for a wraparound extension in Wednesbury start from our West Midlands rate of £2,200–£3,600 per square metre, including VAT. The West Midlands is the baseline for our guide prices.

Wraparound extension prices in Wednesbury
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£48,500–£79,000
L-shaped, about 30 m² of new floor£66,000–£108,000

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a wraparound extension in Wednesbury?

Planning for a wraparound extension in Wednesbury follows the English householder rules.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Wednesbury like to extend?

Red-brick terraces and 1930s semis make up much of Wednesbury. Many already have a small kitchen lean-to at the back, which a new rear extension usually replaces rather than adds to.

How a wraparound extension in Wednesbury comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Wraparound extensions near Wednesbury

From Wednesbury, the nearest places we also cover are Tipton (2.4 miles) and West Bromwich (2.6 miles).

Other work in Wednesbury:

All rear extensions in Wednesbury

FAQ

Wraparound extension questions in Wednesbury

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

What roof suits a wraparound?

A flat roof with a lantern, a standing-seam pitched roof or a glazed roof over the side leg. The choice usually follows the first-floor windows above.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

How long does a rear extension take to build in Wednesbury?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price