Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Longton, Staffordshire

Wraparound extension in Longton

We plan and build wraparound extensions for homeowners in Longton. An L-shaped extension that fills the side return and runs across the back. Start with a free site visit, then a written price once the design is agreed.

We cover Longton (ST2, ST3 and ST4) as part of our Staffordshire work. Wraparounds are the natural next step for the end-of-terrace and Victorian houses in Staffordshire where a side return alone would leave the room too narrow.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Longton?

A wraparound extension in Longton is priced at £2,200–£3,600 per square metre including VAT as a guide, before kitchen fit-out and fees. The West Midlands is the baseline for our guide prices.

Wraparound extension prices in Longton
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£48,500–£79,000
L-shaped, about 30 m² of new floor£66,000–£108,000

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a wraparound extension in Longton?

Planning for a wraparound extension in Longton follows the English householder rules.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Longton like to extend?

Red-brick terraces and 1930s semis make up much of Longton. Many already have a small kitchen lean-to at the back, which a new rear extension usually replaces rather than adds to.

How a wraparound extension in Longton comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Wraparound extensions near Longton

Close by, we work in Stoke-on-Trent, about 2.6 miles away, and Newcastle under Lyme, about 4.3 miles away.

Other work in Longton:

All rear extensions in Longton

FAQ

Wraparound extension questions in Longton

How much does a wraparound extension cost in Longton?

As a guide, £2,200–£3,600 per square metre including VAT for a standard specification. For example, L-shaped, about 22 m² of new floor: about £48,500–£79,000 at that rate. Your written price follows the survey.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Is it worth it over a side return alone?

If you want a dining table and a sofa as well as the kitchen, usually yes.

How long does a rear extension take to build in Longton?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

What postcode areas do you cover around Longton?

Including ST2, ST3 and ST4, and the surrounding Staffordshire area.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price