Wraparound extension in Bootle

Wraparound extension in Bootle: an L-shaped extension that fills the side return and runs across the back. We measure the house, show you what the rules allow, price it in writing and build it.

Bootle sits in Merseyside, with postcode districts including L20, L21 and L22. Wraparounds are the natural next step for the end-of-terrace and Victorian houses in Merseyside where a side return alone would leave the room too narrow.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Bootle?

In Bootle, our guide for a wraparound extension is £2,070–£3,380 per square metre including VAT for a standard specification. North West prices sit below our West Midlands baseline; access on terraced streets is the main variable.

Wraparound extension prices in Bootle
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£45,500–£74,500
L-shaped, about 30 m² of new floor£62,000–£101,500

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a wraparound extension in Bootle?

Here is how the rules in England apply to a wraparound extension in Bootle.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Bootle like to extend?

Stone and brick terraces are common around Bootle. Where houses back onto a ginnel or alley, deliveries can come in from the rear, which makes the build tidier.

How a wraparound extension in Bootle comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Wraparound extensions near Bootle

Neighbouring places we cover include Litherland (0.8 miles) and Kirkdale (2.8 miles).

Other work in Bootle:

All rear extensions in Bootle

FAQ

Wraparound extension questions in Bootle

Can you match the brick or stone on my Bootle house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

What postcode areas do you cover around Bootle?

Including L20, L21 and L22, and the surrounding Merseyside area.

Is it worth it over a side return alone?

If you want a dining table and a sofa as well as the kitchen, usually yes.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

How long does a rear extension take to build in Bootle?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.