Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Kew, Greater London

Wraparound extension in Kew

An L-shaped extension that fills the side return and runs across the back. If you live in Kew and want to know what a wraparound extension would cost and whether it needs planning, start with the online guide price or a free site visit.

Kew and its postcode districts TW8, TW9 and W4 are part of our Greater London coverage. Wraparound projects around Kew often involve two neighbours, so we start the party wall conversations early.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Kew?

A wraparound extension in Kew is priced at £2,860–£4,680 per square metre including VAT as a guide, before kitchen fit-out and fees. London prices sit at the top of our range because of labour rates, access through the house, parking suspensions and skip licences.

Wraparound extension prices in Kew
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£63,000–£103,000
L-shaped, about 30 m² of new floor£86,000–£140,500

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a wraparound extension in Kew?

Planning for a wraparound extension in Kew follows the English householder rules.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Kew like to extend?

Much of Kew is 1920s and 1930s semis and short terraces with longer gardens than inner London, which suit full-width single-storey rear extensions. Parking suspensions, skip licences and controlled hours on residential streets shape the programme more than the build itself.

How a wraparound extension in Kew comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Wraparound extensions near Kew

We also build wraparound extensions in nearby Brentford (0.9 miles) and Mortlake (1.2 miles).

Other work in Kew:

All rear extensions in Kew

FAQ

Wraparound extension questions in Kew

Do I need planning permission for a rear extension in Kew?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

What roof suits a wraparound?

A flat roof with a lantern, a standing-seam pitched roof or a glazed roof over the side leg. The choice usually follows the first-floor windows above.

Do you handle building control in Kew?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

How long does a rear extension take to build in Kew?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price