Kew, Greater London
Two-storey rear extension in Kew
For homes in Kew, a two-storey rear extension is often the simplest way to gain space without moving. A larger kitchen downstairs and an extra bedroom or bathroom upstairs, under one roof. We take it from survey to completion certificate.
Kew sits in Greater London, with postcode districts including TW8, TW9 and W4. In Greater London we check the neighbours' rear windows first, because the upper floor is where most two-storey schemes win or lose planning.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a two-storey rear extension cost in Kew?
Guide prices for a two-storey rear extension in Kew start from our London rate of £2,340–£3,510 per square metre, including VAT. London prices sit at the top of our range because of labour rates, access through the house, parking suspensions and skip licences.
| Size | Guide price inc VAT |
|---|---|
| 3 m × 5 m footprint, two floors (30 m²) | £70,000–£105,500 |
| 4 m × 6 m footprint, two floors (48 m²) | £112,500–£168,500 |
Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.
Do you need planning permission for a two-storey rear extension in Kew?
Whether your two-storey rear extension in Kew needs a planning application depends on its size, your house and any local restrictions.
England's rules allow a rear extension of more than one storey without an application only when it is no deeper than 3 metres and at least 7 metres from the boundary opposite the rear wall, and never on designated land. Most two-storey schemes need householder planning permission.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Kew like to extend?
Kew is mostly 1930s semis, short terraces and post-war houses, so full-width single-storey and two-storey rear extensions are realistic on many plots. Some later estates had permitted development rights removed by condition, so we check the planning history first.
How a two-storey rear extension in Kew comes together
Survey visit
We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Paperwork handled
Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.
Fixed price and build
A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.
Two-storey rear extensions near Kew
We also build two-storey rear extensions in nearby Brentford (0.9 miles) and Mortlake (1.2 miles).
- Two-storey rear extension in Brentford
- Two-storey rear extension in Mortlake
- Two-storey rear extension in Chiswick
- Two-storey rear extension in East Sheen
- Two-storey rear extension in Richmond
Other work in Kew:
FAQ
Two-storey rear extension questions in Kew
What postcode areas do you cover around Kew?
Including TW8, TW9 and W4, and the surrounding Greater London area.
How long does a rear extension take to build in Kew?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Can it be built on a terraced house?
Sometimes, but the upper floor is harder to get through planning on a terrace because of the effect on neighbours. A single-storey extension with a loft conversion is often an easier route.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
Do you handle building control in Kew?
Yes. We apply to the council or a registered building control approver and hand over the completion certificate.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.