Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Blandford Forum, Dorset

Wraparound extension in Blandford Forum

An L-shaped extension that fills the side return and runs across the back. If you live in Blandford Forum and want to know what a wraparound extension would cost and whether it needs planning, start with the online guide price or a free site visit.

Blandford Forum is covered from our Dorset round, including DT11. Wraparound projects around Blandford Forum often involve two neighbours, so we start the party wall conversations early.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Blandford Forum?

For Blandford Forum we work from the South West England rate: £2,290–£3,740 per square metre of new floor, including VAT, standard specification. South West prices run slightly above our West Midlands baseline; natural stone to match the house is the main variable.

Wraparound extension prices in Blandford Forum
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£50,500–£82,500
L-shaped, about 30 m² of new floor£68,500–£112,500

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission for a wraparound extension in Blandford Forum?

Here is how the rules in England apply to a wraparound extension in Blandford Forum.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Blandford Forum like to extend?

Stone-built and rendered houses are common around Blandford Forum, so matching the walling is a design decision in its own right: natural stone, reconstituted stone or a render finish across old and new.

How a wraparound extension in Blandford Forum comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Wraparound extensions near Blandford Forum

Close by, we work in Wimborne Minster, about 9.4 miles away, and Broadstone, about 10.2 miles away.

Other work in Blandford Forum:

All rear extensions in Blandford Forum

FAQ

Wraparound extension questions in Blandford Forum

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

How much does a wraparound extension cost in Blandford Forum?

As a guide, £2,290–£3,740 per square metre including VAT for a standard specification. For example, L-shaped, about 22 m² of new floor: about £50,500–£82,500 at that rate. Your written price follows the survey.

Will it take a lot of garden?

Less than a deep rear extension of the same area, because part of the space comes from the side passage.

How long does a rear extension take to build in Blandford Forum?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price