Dorset
Wraparound extensions in Dorset
An L-shaped extension that fills the side return and runs across the back. We design and build rear extensions across Dorset, from Bournemouth and Poole to Weymouth, covering single-storey kitchen extensions, two-storey additions, side returns and wraparounds.

In Bournemouth we usually draw the wraparound and a simpler rear-only option side by side, so the planning risk and cost difference are clear. Dorset has Victorian terraces nearer the centre and post-war semis on the edges. Sloping gardens are frequent, which affects floor levels and steps down to the patio.
How much does a wraparound extension cost in Dorset?
In Dorset, our guide for a wraparound extension is £2,290–£3,740 per square metre including VAT for a standard specification. South West prices run slightly above our West Midlands baseline; natural stone to match the house is the main variable.
| Size | Guide price inc VAT |
|---|---|
| L-shaped, about 22 m² of new floor | £50,500–£82,500 |
| L-shaped, about 30 m² of new floor | £68,500–£112,500 |
Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.
Do you need planning permission in Dorset?
Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.
The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent.
Where in Dorset do we work?
FAQ
Questions people ask
Does a wraparound need planning permission?
Often yes, because the side and rear parts are judged together. Some fit within permitted development; we check before drawing.
How long does a wraparound take?
Usually 14 to 20 weeks on site, longer than a plain rear extension because of the steelwork.
Can the corner be all glass?
Yes, with a steel or aluminium post or a structural glass corner. It needs careful thermal detailing to meet Building Regulations.
Do you cover all of Dorset?
We cover 14 towns and districts in Dorset, including Bournemouth, Poole and Weymouth.
Who builds the extension?
Vetted building teams working under contract to us; your contract is with S&K Property Investments and Improvement Ltd.