Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Swadlincote, Derbyshire

Wraparound extension in Swadlincote

For homes in Swadlincote, a wraparound extension is often the simplest way to gain space without moving. An L-shaped extension that fills the side return and runs across the back. We take it from survey to completion certificate.

Swadlincote is covered from our Derbyshire round, including DE11. Wraparounds are the natural next step for the end-of-terrace and Victorian houses in Derbyshire where a side return alone would leave the room too narrow.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Swadlincote?

For Swadlincote we work from the East Midlands rate: £2,130–£3,490 per square metre of new floor, including VAT, standard specification. East Midlands prices sit a little below our West Midlands baseline.

Wraparound extension prices in Swadlincote
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£47,000–£77,000
L-shaped, about 30 m² of new floor£64,000–£105,000

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a wraparound extension in Swadlincote?

Planning for a wraparound extension in Swadlincote follows the English householder rules.

Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Swadlincote like to extend?

Swadlincote has plenty of inter-war semis and bungalows, and single-storey rear extensions suit both.

How a wraparound extension in Swadlincote comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Wraparound extensions near Swadlincote

Neighbouring places we cover include Ashby-de-la-Zouch (4.0 miles) and Burton upon Trent (4.2 miles).

Other work in Swadlincote:

All rear extensions in Swadlincote

FAQ

Wraparound extension questions in Swadlincote

Do you handle building control in Swadlincote?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Do I need planning permission for a rear extension in Swadlincote?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Can the corner be all glass?

Yes, with a steel or aluminium post or a structural glass corner. It needs careful thermal detailing to meet Building Regulations.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

How long does a rear extension take to build in Swadlincote?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price