Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Shirebrook, Derbyshire

Wraparound extension in Shirebrook

Wraparound extension in Shirebrook: an L-shaped extension that fills the side return and runs across the back. We measure the house, show you what the rules allow, price it in writing and build it.

We cover Shirebrook (NG19 and NG20) as part of our Derbyshire work. In Shirebrook we usually draw the wraparound and a simpler rear-only option side by side, so the planning risk and cost difference are clear.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Shirebrook?

A wraparound extension in Shirebrook is priced at £2,130–£3,490 per square metre including VAT as a guide, before kitchen fit-out and fees. East Midlands prices sit a little below our West Midlands baseline.

Wraparound extension prices in Shirebrook
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£47,000–£77,000
L-shaped, about 30 m² of new floor£64,000–£105,000

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a wraparound extension in Shirebrook?

Planning for a wraparound extension in Shirebrook follows the English householder rules.

Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Shirebrook like to extend?

Shirebrook has plenty of inter-war semis and bungalows, and single-storey rear extensions suit both.

How a wraparound extension in Shirebrook comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Wraparound extensions near Shirebrook

Neighbouring places we cover include Mansfield Woodhouse (2.8 miles) and Bolsover (3.7 miles).

Other work in Shirebrook:

All rear extensions in Shirebrook

FAQ

Wraparound extension questions in Shirebrook

Is the site visit in Shirebrook free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

What postcode areas do you cover around Shirebrook?

Including NG19 and NG20, and the surrounding Derbyshire area.

Does a wraparound need planning permission?

Often yes, because the side and rear parts are judged together. Some fit within permitted development; we check before drawing.

How long does a rear extension take to build in Shirebrook?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price