Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Coventry, West Midlands

Terraced house rear extension in Coventry

For homes in Coventry, a terraced house rear extension is often the simplest way to gain space without moving. Rear and side return extensions for terraces, with access through the house and two neighbours. We take it from survey to completion certificate.

Coventry is covered from our West Midlands round, including CV2, CV3, CV4 and CV5. In Coventry we plan the delivery route through the house and the skip licence before anything else.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a terraced house rear extension cost in Coventry?

For Coventry we work from the West Midlands rate: £2,050–£3,300 per square metre of new floor, including VAT, standard specification. The West Midlands is the baseline for our guide prices.

Terraced house rear extension prices in Coventry
SizeGuide price inc VAT
3 m wide × 4.5 m deep (13.5 m²)£27,500–£44,500
3 m wide × 6 m deep (18 m²)£37,000–£59,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a terraced house rear extension in Coventry?

The planning route for a terraced house rear extension in Coventry is set by England's householder rules and your council.

In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Coventry like to extend?

Coventry has a lot of post-war semis and estate houses with long gardens and side access, which makes rear extensions quicker to build.

How a terraced house rear extension in Coventry comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Terraced house rear extensions near Coventry

Neighbouring places we cover include Kenilworth (4.9 miles) and Bedworth (5.3 miles).

Other work in Coventry:

All rear extensions in Coventry

FAQ

Terraced house rear extension questions in Coventry

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

How long does a rear extension take to build in Coventry?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can you build without side access?

Yes. Materials come through the house in protected runs or over the roof by crane on tight sites.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

How much does a terraced house rear extension cost in Coventry?

As a guide, £2,050–£3,300 per square metre including VAT for a standard specification. For example, 3 m wide × 4.5 m deep (13.5 m²): about £27,500–£44,500 at that rate. Your written price follows the survey.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price