Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Coventry, West Midlands

Kitchen-diner rear extension in Coventry

For homes in Coventry, a kitchen-diner rear extension is often the simplest way to gain space without moving. An open-plan kitchen, dining and family room that opens straight onto the garden. We take it from survey to completion certificate.

Coventry is covered from our West Midlands round, including CV2, CV3, CV4 and CV5. For Coventry kitchens we plan the extraction route and the island drainage before the slab is poured, so nothing has to be chased in later.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a kitchen-diner rear extension cost in Coventry?

For Coventry we work from the West Midlands rate: £1,900–£3,100 per square metre of new floor, including VAT, standard specification. The West Midlands is the baseline for our guide prices.

Kitchen-diner rear extension prices in Coventry
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£23,000–£37,000
4 m wide × 5 m deep (20 m²)£38,000–£62,000
4 m wide × 6 m deep (24 m²)£45,500–£74,500

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission for a kitchen-diner rear extension in Coventry?

Planning for a kitchen-diner rear extension in Coventry follows the English householder rules.

In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.

England also has the larger home extension route: a single-storey rear extension of up to 6 metres on an attached house or 8 metres on a detached house, after prior approval from the council. The council notifies your neighbours and has 42 days to decide; the fee is £249 (£310 for applications made from 8 December 2026). The route is not available on designated land such as conservation areas.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Coventry like to extend?

Red-brick terraces and 1930s semis make up much of Coventry. Many already have a small kitchen lean-to at the back, which a new rear extension usually replaces rather than adds to.

How a kitchen-diner rear extension in Coventry comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Kitchen-diner rear extensions near Coventry

From Coventry, the nearest places we also cover are Kenilworth (4.9 miles) and Bedworth (5.3 miles).

Other work in Coventry:

All rear extensions in Coventry

FAQ

Kitchen-diner rear extension questions in Coventry

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Should the sink face the garden?

If the plan allows, an island sink or hob facing the glass is a common choice. It needs a floor-level drain run, which is easy to lay in a new slab.

How long does a rear extension take to build in Coventry?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

What postcode areas do you cover around Coventry?

Including CV2, CV3, CV4, CV5, CV6 and CV7, and the surrounding West Midlands area.

Do you handle building control in Coventry?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price