Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Wellington, Shropshire

Terraced house rear extension in Wellington

For homes in Wellington, a terraced house rear extension is often the simplest way to gain space without moving. Rear and side return extensions for terraces, with access through the house and two neighbours. We take it from survey to completion certificate.

Wellington sits in Shropshire, with postcode districts including TF1 and TF5. Terraced streets make up much of the housing in parts of Shropshire, and most rear extensions here go in without side access.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a terraced house rear extension cost in Wellington?

A terraced house rear extension in Wellington is priced at £2,050–£3,300 per square metre including VAT as a guide, before kitchen fit-out and fees. The West Midlands is the baseline for our guide prices.

Terraced house rear extension prices in Wellington
SizeGuide price inc VAT
3 m wide × 4.5 m deep (13.5 m²)£27,500–£44,500
3 m wide × 6 m deep (18 m²)£37,000–£59,500

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a terraced house rear extension in Wellington?

The planning route for a terraced house rear extension in Wellington is set by England's householder rules and your council.

In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Wellington like to extend?

Wellington has a lot of post-war semis and estate houses with long gardens and side access, which makes rear extensions quicker to build.

How a terraced house rear extension in Wellington comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Terraced house rear extensions near Wellington

We also build rear extensions for terraced houses in nearby Hadley (1.4 miles) and Telford (3.3 miles).

Other work in Wellington:

All rear extensions in Wellington

FAQ

Terraced house rear extension questions in Wellington

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Do both neighbours need party wall notices?

Usually yes in England and Wales, because the extension often sits on or near both boundaries.

How long does a rear extension take to build in Wellington?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do you handle building control in Wellington?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

What postcode areas do you cover around Wellington?

Including TF1 and TF5, and the surrounding Shropshire area.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price