Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Worksop, Nottinghamshire

Terraced house rear extension in Worksop

We plan and build rear extensions for terraced houses for homeowners in Worksop. Rear and side return extensions for terraces, with access through the house and two neighbours. Start with a free site visit, then a written price once the design is agreed.

Worksop sits in Nottinghamshire, with postcode districts including S80 and S81. Terraced streets make up much of the housing in parts of Nottinghamshire, and most rear extensions here go in without side access.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a terraced house rear extension cost in Worksop?

Guide prices for a terraced house rear extension in Worksop start from our East Midlands rate of £1,990–£3,200 per square metre, including VAT. East Midlands prices sit a little below our West Midlands baseline.

Terraced house rear extension prices in Worksop
SizeGuide price inc VAT
3 m wide × 4.5 m deep (13.5 m²)£27,000–£43,000
3 m wide × 6 m deep (18 m²)£36,000–£57,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a terraced house rear extension in Worksop?

The planning route for a terraced house rear extension in Worksop is set by England's householder rules and your council.

English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Worksop like to extend?

Red-brick terraces and semis are typical of Worksop. Coal-mining legacy areas in parts of the East Midlands can need a Coal Authority check before foundations are designed.

How a terraced house rear extension in Worksop comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Terraced house rear extensions near Worksop

Close by, we work in Dinnington, about 5.5 miles away, and Retford, about 7.6 miles away.

Other work in Worksop:

All rear extensions in Worksop

FAQ

Terraced house rear extension questions in Worksop

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

How do you keep the house clean?

Dust screens, floor protection and a single protected route through the house.

Can you match the brick or stone on my Worksop house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

How long does a rear extension take to build in Worksop?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

What postcode areas do you cover around Worksop?

Including S80 and S81, and the surrounding Nottinghamshire area.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price