Redcar, North Yorkshire
Terraced house rear extension in Redcar
Rear and side return extensions for terraces, with access through the house and two neighbours. We design, get the approvals for and build rear extensions for terraced houses in Redcar and the surrounding area, with one contract from the first survey to building control sign-off.
Redcar sits in North Yorkshire, with postcode districts including TS6 and TS10. Terraced streets make up much of the housing in parts of North Yorkshire, and most rear extensions here go in without side access.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a terraced house rear extension cost in Redcar?
In Redcar, our guide for a terraced house rear extension is £1,840–£2,970 per square metre including VAT for a standard specification. North East prices are among the lowest in our range; former mining ground is the main foundation variable.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4.5 m deep (13.5 m²) | £25,000–£40,000 |
| 3 m wide × 6 m deep (18 m²) | £33,000–£53,500 |
These are guide ranges; the written quote after the survey is the figure that counts.
Do you need planning permission for a terraced house rear extension in Redcar?
Here is how the rules in England apply to a terraced house rear extension in Redcar.
In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.
Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.
What are homes in Redcar like to extend?
Brick terraces, colliery houses and post-war semis make up much of Redcar. Former mining areas often need a coal mining risk check before foundations are designed.
How a terraced house rear extension in Redcar comes together
Survey visit
We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.
Design and guide price
Two or three layout options with a guide price for each, so you choose the design knowing what it costs.
Planning and regulations
We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Terraced house rear extensions near Redcar
Close by, we work in Guisborough, about 5.7 miles away, and Middlesbrough, about 7.5 miles away.
- Terraced house rear extension in Guisborough
- Terraced house rear extension in Middlesbrough
- Terraced house rear extension in Hartlepool
- Terraced house rear extension in Billingham
- Terraced house rear extension in Stockton-on-Tees
Other work in Redcar:
FAQ
Terraced house rear extension questions in Redcar
Do I need planning permission for a rear extension in Redcar?
Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.
Who will build my extension?
Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.
Can you build without side access?
Yes. Materials come through the house in protected runs or over the roof by crane on tight sites.
How long does a rear extension take to build in Redcar?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
What postcode areas do you cover around Redcar?
Including TS6 and TS10, and the surrounding North Yorkshire area.
Do you handle building control in Redcar?
Yes. We apply to the council or a registered building control approver and hand over the completion certificate.