Broadstone, Dorset
Terraced house rear extension in Broadstone
For homes in Broadstone, a terraced house rear extension is often the simplest way to gain space without moving. Rear and side return extensions for terraces, with access through the house and two neighbours. We take it from survey to completion certificate.
We cover Broadstone (BH15, BH17 and BH18) as part of our Dorset work. On a Broadstone terrace both neighbours usually need party wall notices or agreement, so we talk to them early.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a terraced house rear extension cost in Broadstone?
In Broadstone, our guide for a terraced house rear extension is £2,130–£3,430 per square metre including VAT for a standard specification. South West prices run slightly above our West Midlands baseline; natural stone to match the house is the main variable.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4.5 m deep (13.5 m²) | £29,000–£46,500 |
| 3 m wide × 6 m deep (18 m²) | £38,500–£62,000 |
These are guide ranges; the written quote after the survey is the figure that counts.
Do you need planning permission for a terraced house rear extension in Broadstone?
Whether your terraced house rear extension in Broadstone needs a planning application depends on its size, your house and any local restrictions.
Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.
The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.
What are homes in Broadstone like to extend?
Broadstone has Victorian terraces nearer the centre and post-war semis on the edges. Sloping gardens are frequent, which affects floor levels and steps down to the patio.
How a terraced house rear extension in Broadstone comes together
Look round and measure
A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.
Drawings and budget
Floor plans and elevations for the options, each with a guide price.
Approvals
Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Terraced house rear extensions near Broadstone
We also build rear extensions for terraced houses in nearby Canford Heath (1.2 miles) and Wimborne Minster (1.9 miles).
- Terraced house rear extension in Canford Heath
- Terraced house rear extension in Wimborne Minster
- Terraced house rear extension in Poole
- Terraced house rear extension in Ferndown
- Terraced house rear extension in Bournemouth
Other work in Broadstone:
FAQ
Terraced house rear extension questions in Broadstone
Do I need planning permission for a rear extension in Broadstone?
Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.
Can I get a price without a visit?
Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.
How do you keep the house clean?
Dust screens, floor protection and a single protected route through the house.
Do I need a party wall agreement?
In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.
What postcode areas do you cover around Broadstone?
Including BH15, BH17 and BH18, and the surrounding Dorset area.
How long does a rear extension take to build in Broadstone?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.