Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Bournemouth, Dorset

Terraced house rear extension in Bournemouth

Rear and side return extensions for terraces, with access through the house and two neighbours. If you live in Bournemouth and want to know what a terraced house rear extension would cost and whether it needs planning, start with the online guide price or a free site visit.

Bournemouth sits in Dorset, with postcode districts including BH1, BH2, BH3 and BH4. On a Bournemouth terrace both neighbours usually need party wall notices or agreement, so we talk to them early.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a terraced house rear extension cost in Bournemouth?

For Bournemouth we work from the South West England rate: £2,130–£3,430 per square metre of new floor, including VAT, standard specification. South West prices run slightly above our West Midlands baseline; natural stone to match the house is the main variable.

Terraced house rear extension prices in Bournemouth
SizeGuide price inc VAT
3 m wide × 4.5 m deep (13.5 m²)£29,000–£46,500
3 m wide × 6 m deep (18 m²)£38,500–£62,000

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a terraced house rear extension in Bournemouth?

The planning route for a terraced house rear extension in Bournemouth is set by England's householder rules and your council.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Bournemouth like to extend?

Stone-built and rendered houses are common around Bournemouth, so matching the walling is a design decision in its own right: natural stone, reconstituted stone or a render finish across old and new.

How a terraced house rear extension in Bournemouth comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Terraced house rear extensions near Bournemouth

From Bournemouth, the nearest places we also cover are Christchurch (4.4 miles) and Canford Heath (4.4 miles).

Other work in Bournemouth:

All rear extensions in Bournemouth

FAQ

Terraced house rear extension questions in Bournemouth

Can you match the brick or stone on my Bournemouth house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

What postcode areas do you cover around Bournemouth?

Including BH1, BH2, BH3, BH4, BH5 and BH8, and the surrounding Dorset area.

Can a terrace have a two-storey rear extension?

It is possible but harder to get through planning because of the effect on both neighbours.

How long does a rear extension take to build in Bournemouth?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Do I need planning permission for a rear extension in Bournemouth?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price