Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

March, Cambridgeshire

Terraced house rear extension in March

Terraced house rear extension in March: rear and side return extensions for terraces, with access through the house and two neighbours. We measure the house, show you what the rules allow, price it in writing and build it.

March sits in Cambridgeshire, with postcode districts including PE15. On a March terrace both neighbours usually need party wall notices or agreement, so we talk to them early.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a terraced house rear extension cost in March?

A terraced house rear extension in March is priced at £2,170–£3,500 per square metre including VAT as a guide, before kitchen fit-out and fees. East of England prices run slightly above our West Midlands baseline; clay soils near trees are the main foundation variable.

Terraced house rear extension prices in March
SizeGuide price inc VAT
3 m wide × 4.5 m deep (13.5 m²)£29,500–£47,000
3 m wide × 6 m deep (18 m²)£39,000–£63,000

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a terraced house rear extension in March?

Planning for a terraced house rear extension in March follows the English householder rules.

In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in March like to extend?

Post-war semis and newer estates are typical of March, and many have room for a full-width extension. Shrinkable clay is common in the East of England, so foundations near trees and hedges are designed to NHBC-style depth guidance.

How a terraced house rear extension in March comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Terraced house rear extensions near March

We also build rear extensions for terraced houses in nearby Chatteris (6.7 miles) and Primrose Place (8.3 miles).

Other work in March:

All rear extensions in March

FAQ

Terraced house rear extension questions in March

How long does a rear extension take to build in March?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

How deep can I go on a terrace?

3 metres under permitted development in England, or up to 6 metres with prior approval outside designated land.

Do you handle building control in March?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Do I need planning permission for a rear extension in March?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

How much does a terraced house rear extension cost in March?

As a guide, £2,170–£3,500 per square metre including VAT for a standard specification. For example, 3 m wide × 4.5 m deep (13.5 m²): about £29,500–£47,000 at that rate. Your written price follows the survey.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price