Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

March, Cambridgeshire

Two-storey rear extension in March

Two-storey rear extension in March: a larger kitchen downstairs and an extra bedroom or bathroom upstairs, under one roof. We measure the house, show you what the rules allow, price it in writing and build it.

March is covered from our Cambridgeshire round, including PE15. Two-storey rear extensions suit semi-detached houses in March best, where the extra bedroom matters as much as the bigger kitchen.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a two-storey rear extension cost in March?

For March we work from the East of England rate: £1,910–£2,860 per square metre of new floor, including VAT, standard specification. East of England prices run slightly above our West Midlands baseline; clay soils near trees are the main foundation variable.

Two-storey rear extension prices in March
SizeGuide price inc VAT
3 m × 5 m footprint, two floors (30 m²)£57,000–£86,000
4 m × 6 m footprint, two floors (48 m²)£91,500–£137,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a two-storey rear extension in March?

Here is how the rules in England apply to a two-storey rear extension in March.

England's rules allow a rear extension of more than one storey without an application only when it is no deeper than 3 metres and at least 7 metres from the boundary opposite the rear wall, and never on designated land. Most two-storey schemes need householder planning permission.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in March like to extend?

Post-war semis and newer estates are typical of March, and many have room for a full-width extension. Shrinkable clay is common in the East of England, so foundations near trees and hedges are designed to NHBC-style depth guidance.

How a two-storey rear extension in March comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Two-storey rear extensions near March

Neighbouring places we cover include Chatteris (6.7 miles) and Primrose Place (8.3 miles).

Other work in March:

All rear extensions in March

FAQ

Two-storey rear extension questions in March

How long does a rear extension take to build in March?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need planning permission for a rear extension in March?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Will we need to move out?

Rarely. The first-floor opening is made late in the job and sealed with temporary screens.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

How much does a two-storey rear extension cost in March?

As a guide, £1,910–£2,860 per square metre including VAT for a standard specification. For example, 3 m × 5 m footprint, two floors (30 m²): about £57,000–£86,000 at that rate. Your written price follows the survey.

Do you handle building control in March?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price