Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Marlow, Buckinghamshire

Terraced house rear extension in Marlow

We plan and build rear extensions for terraced houses for homeowners in Marlow. Rear and side return extensions for terraces, with access through the house and two neighbours. Start with a free site visit, then a written price once the design is agreed.

Marlow is covered from our Buckinghamshire round, including SL7. Terraced streets make up much of the housing in parts of Buckinghamshire, and most rear extensions here go in without side access.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a terraced house rear extension cost in Marlow?

For Marlow we work from the South East England rate: £2,300–£3,700 per square metre of new floor, including VAT, standard specification. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Terraced house rear extension prices in Marlow
SizeGuide price inc VAT
3 m wide × 4.5 m deep (13.5 m²)£31,000–£50,000
3 m wide × 6 m deep (18 m²)£41,500–£66,500

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a terraced house rear extension in Marlow?

Planning for a terraced house rear extension in Marlow follows the English householder rules.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Marlow like to extend?

Around Marlow the housing ranges from inter-war semis to 1960s and 1970s estates with good-sized gardens. Many of the newer estates had permitted development rights removed by condition, so we check the planning history before anything is drawn.

How a terraced house rear extension in Marlow comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Terraced house rear extensions near Marlow

We also build rear extensions for terraced houses in nearby Maidenhead (4.0 miles) and High Wycombe (4.3 miles).

Other work in Marlow:

All rear extensions in Marlow

FAQ

Terraced house rear extension questions in Marlow

How long does a rear extension take to build in Marlow?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do you handle building control in Marlow?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

How do you keep the house clean?

Dust screens, floor protection and a single protected route through the house.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Do I need planning permission for a rear extension in Marlow?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price